EasyManuals Logo

Trane GRCA User Manual

Trane GRCA
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and
air-conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered
equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the
literature and on the tags, stickers, and labels that are attached to the equipment.
May 2017
MMUUAA--SSVVXX000033BB--EENN
Packaged Rooftop Arrangements
For Heating, Cooling and Ventilating Systems
MMooddeell NNuummbbeerrss::
GRAA
GRBA
GRCA
GRDA
AHAA
AHBA
Installation, Operation,
and Maintenance

Other manuals for Trane GRCA

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane GRCA and is the answer not in the manual?

Trane GRCA Specifications

General IconGeneral
Product TypeAir Conditioner
HSPFNot Applicable
RefrigerantR-410A
Voltage208/230V
Sound Level72 dB
StagesSingle Stage
Cooling Capacity1.5 - 5 Ton
Warranty10-Year Limited Warranty on Compressor

Related product manuals