140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
August 2020
RRTT--SSVVXX006633EE--EENN
Installation, Operation, and Maintenance
IntelliPak with Symbio 800
Commercial Rooftop Air Conditioners
AA aanndd llaatteerr ddeessiiggnn sseeqquueennccee
RRAA *20, *25, *30, *40, *50, *55, *60,
*70, *75

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane IntelliPak RA 20 and is the answer not in the manual?

Trane IntelliPak RA 20 Specifications

General IconGeneral
ModelIntelliPak RA 20
CategoryAir Conditioner
Refrigerant TypeR-410A
Compressor TypeScroll
Phase3
Heating Capacity240, 000 - 480, 000 BTU/h
Energy Efficiency Ratio (EER)8.5 - 10.5
Voltage460V
Sound Level75 - 85 dBA

Summary

Introduction

Model Number Description

Pre-Installation Procedures

Unit Inspection and Damage Checks

Steps for inspecting the unit for shipping damage and verifying components.

Installation Procedures

Unit Rigging and Placement

Safety instructions and steps for lifting and positioning the unit.

Electrical Connections and Wiring

Instructions for main power and control wiring connections.

Gas Heat Installation

Steps for connecting gas supply and ensuring proper gas train setup.

Refrigeration System Setup

Details on condensate drain connections and compressor crankcase heaters.

Electrical Data and Service Sizing

Electrical Service Sizing Calculations

Formulas for calculating Minimum Circuit Ampacity (MCA) and MOP.

Service Sizing Data Tables

Tables providing electrical service sizing data for compressors and fans.

Unit Startup Procedures

Electrical Phasing and Safety

Procedures for checking electrical phasing and handling hazardous voltage.

Fan Operation Verification

Steps to verify proper rotation and operation of supply, relief, and condenser fans.

Gas Furnace Startup and Adjustment

Procedures for startup and adjustment of staged, modulating gas furnaces.

Final Unit Checkout

Final checks to perform before leaving the unit after startup.

Startup Checklist and Control Parameters

General Startup Checklist Items

Comprehensive checklist for unit startup verification.

Sequence of Operation

Compressor Staging and Timers

Details on compressor staging logic, timers, and protections.

Compressor Protections

Overview of safety features protecting compressors from damage.

Performance Data

Refrigeration System Details

Service and Maintenance

Refrigerant Evacuation and Charging

Procedures for safely evacuating and charging the refrigerant system.

Variable Speed Compressor VFD Programming

Parameters for programming VFDs for variable speed compressors.

Related product manuals