Pre-Installation
ARTC-SVX005A-EN 19
Check the box if source/sink chilled water lines have been leak tested according to prestartup instructions.
Check the box if source/sink reservoir (if included) is at operating level with correct water/glycol mixture.
Check the box if high voltage wiring is installed, tested, and functional.
Check the box if all water, refrigeration, electrical, and control connections between chiller/heater modules are
completed.
Check the box if all control wiring between modular chiller/heaters is installed, tested, and functional.
Check the box if control wiring is complete, including any remote interface panel or special-purpose module wiring.
Check the box if all responsible installing contractors and sub-contractors have been notified to have
representatives available on site to provide technical support for the initial start-up procedure.
Check the box if full load will be available for chiller/heater on the initial start-up date.
Touchscreen Interface Panel: Record version and date of the software loaded into the touchscreen interface panel:
Version: ____________________________________ Date: ________________
Note: To view the software version, from the home screen, press the software button on the System Control screen.
Table 2. Initial startup readiness checklist (continued)
Startup Readiness Dimension

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane PolyTherm ARTC-SVX005A-EN and is the answer not in the manual?

Trane PolyTherm ARTC-SVX005A-EN Specifications

General IconGeneral
BrandTrane
ModelPolyTherm ARTC-SVX005A-EN
CategoryTemperature Controller
LanguageEnglish

Related product manuals