Pre-Installation
Installation requirements and contractor responsibilities
A list of the contractor responsibilities typically associated with the unit installation process is provided.
Type of requirement
Trane-supplied
Trane-installed
Trane-supplied
Field-installed
Field-supplied
Field-installed
Foundation Meet foundation requirements
Rigging
Safety chains
Clevis connectors
Lifting beams
Isolation
Neoprene Pads
Isolators
(Optional)
Neoprene Pads
Isolators (Customer Supplied)
Electrical
Disconnect
Switch
Unit mounted
starter
Wiring sizes per submittals and local codes and
regulations
Terminal lugs
Ground connection(s)
BAS Wiring (optional)
Control voltage wiring
Chilled water pump contactor and wiring
including interlock
Option relays and wiring
Water piping
Flow Switch
Water Strainer
(Optional)
Taps for thermometers and gauges
Thermometers
Water ow pressure gauges
Isolation and balancing valves in water piping
Vents and drains
Pressure relief valves
Pressure switch device to detect lack of water
Insulation Insulation Insulation (Piping)
Water piping connection elements Grooved pipe
Grooved pipe
couplings (or)
Flanged Adapters