EasyManua.ls Logo

Unic Tango Ace - COMMISSIONING; Startup and Module ST Operation

Unic Tango Ace
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
ace
4- COMMISSIONING
Switching on the machine and Turning on the heating
Once all the connections are made and checked (water supply, electricity supply and drain).
Set the main switch in position 1.
As soon as the electricity is switched on, the boilers ll automatically.
Remember to open the water tap supplying the machine.
The heating of all the parts starts automatically if the lling is correct.*
When the machine reaches its operating temperature, it performs a self-check.
These initialization phases are very important for the proper functioning of the machine. They are only possible
if the co󰀨ee grounds drawer is in place, and they must not be interrupted, for instance by removing the drawer.
(The steam pressure and the temperature of the groups are visible on the screen during heating).
The machine is operational once heating has been switched on and the self-check performed.
It is advisable to leave the machine heating on permanently.
Module ST
The temperature display indicates the ambient temperature of the refrigerator.
Specicities:
Compressor electrical regulation
Contact temperature of the liquid
Liquid level probe (triggered at <1.2 liter)
9 liter container capacity
Dimensions:
Outer (width * Length * height) 8.6” x 18” x 15.4”
Key locking of the
refrigerator
Temperature display
UNIC part number for the display: 45039

Table of Contents

Other manuals for Unic Tango Ace

Related product manuals