GENISYS II System Hardware Installation UNION SWITCH & SIGNAL
SM-6900B Rev. 0.0 August 1999 3-15
The 20 mA current loop cable should be run below ground, where it runs outside of the
equipment house or case to minimize possible lightning damage. The shield wire at the end of the
cable should be grounded using one of the 25-pin “D” connector attachment screws on the
interface panel. In addition, a rack ground wire should be run from the panel’s
EARTH GROUND
dual Fasten terminal to the equipment rack prime ground bus. Keep this wire as short as possible
and minimize the number of bends. The current loop cable should also be provided strain relief
by securing it to the rack frame with wire tie straps.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Union Switch & Signal GENISYS II and is the answer not in the manual?

Union Switch & Signal GENISYS II Specifications

General IconGeneral
BrandUnion Switch & Signal
ModelGENISYS II
CategoryControl Unit
LanguageEnglish