9
OPERATIONS MANUAL Rev. 1.4
Details about lifting means
Instructions for lifting process
• The water tank must be empty.
• Check water tank valve before lifting the machine.
• The high-pressure hose must be lifted separately.
Lifting should only be done with certified lifting straps according to ΕΝ 1492-1 (Flat woven webbing
sling).