EasyManua.ls Logo

Universal Robots UR3e

Universal Robots UR3e
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.5. Circuit Breaker Installation
Use a double pole circuit breaker to protect the power input connector, as it can also be used as a
switch. If a fuse is used, then a two-pole switch must be installed between the fuse and power input
connector.
The following illustration shows the circuit breaker wiring scheme.
1 OEM power input 2 Circuit breaker
CAUTION
Failure to install appropriate fuses or circuit breakers can result in equipment
damage or personnel injury.
The installation shall comply with the standard IEC 60364.
Installation Guide OEM Control Box
Copyright © 2019–2024 by UniversalRobotsA/S. All rights reserved.

Other manuals for Universal Robots UR3e

Related product manuals