4.1 Equipment Delivery
/Equipment Installation
04
Upon arrival of the equipment, please follow these steps and inspect the outer
packaging for any damages. Pay attention to safety instructions while handling,
and be sure to wear protective gloves.
4.1.1 Check the Transport Packaging
Carefully inspect the transport packaging for any damages to ensure the outer
packaging is intact, preventing any potential damage to the equipment during
transportation.
4.1.2 Unpacking the Box
Unlock the locks of the packaging box and carefully lift the packaging box off
the equipment.
Note: It is recommended to retain the original packaging for future moving and
transportation. This helps ensure proper protection of the equipment during
movement, reducing the risk of damage during transportation.
Ion generator
Tool setter
Calibration column
Tool Magazine 1: Zirconia / Wax 2.0mm
Tool Magazine 2: Zirconia / Wax 1.0mm
Tool Magazine 3: Zirconia / Wax 0.6mm
Tool Magazine 4: Zirconia / Wax 0.3mm
Tool Magazine 5: PMMA 2.0mm
Tool Magazine 6: PMMA 1.0mm
Tool Magazine 7: PMMA 0.6mm
Tool Magazine 8: Spare
Tool Magazine 9: Composite resin 2.0mm
Tool Magazine 10: Composite resin 1.0mm
Tool Magazine 11: Composite resin 0.6mm
Tool Magazine 12: Spare
Tool Magazine 13: Calibration magazine
11 12
Introduction to the tool magazine