EasyManua.ls Logo

VALTIR QuadGuard - Page 25

Default Icon
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Valtir.com 24 Revision D November 2022
3) Anchor the Monorail
A) Monorail Assembly for Concrete Backup (Figure 19)
Locate Monorail on foundation with side of Monorail on the construction line and rear edge
of Monorail foot 10” forward of front face of Concrete Backup.
Orient the Monorail so that the Monorail tongues face Backup.
Warning: Every borehole and slot in Backup and Monorail must be anchored by
a stud using an approved adhesive.
Anchor each Monorail section using the approved adhesive kits provided. Reference the
adhesive manufacturer’s instructions included with kit. It is important to attach each
segment of Monorail in alignment from the back to the front of the system (±1/4” [6 mm]).
Warning: Improper alignment at the Monorail splice joints will prevent proper
system collapse during impact (p. 26).
Figure 20
Proper Stud Height
Figure 19
Monorail Location for Concrete Backup
WASHER
ROADWAY
BACKUP OR MONORAIL
NUT
CAUTION:
1.5” [40 mm]
MAXIMUM STUD HEIGHT
Anchor

Related product manuals