EasyManua.ls Logo

Vatech A9

Vatech A9
196 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12. Maintenance
128 vatech A9 (Model name: PHT-30CSS) User Manual
12.2 Maintenance Task Checklist
Tasks Period
Before the operation, ensure that the equipment is clean and ready for
use. Make sure that all parts that come in direct contact with the patient
have been cleaned thoroughly.
Daily
After using the equipment, make sure that the Main Power Switch has
been turned off.
Daily
Ensure that the equipment is firmly plugged into a dedicated power
source.
Daily
Ensure that the plug and the power cord are not heated abnormally. Daily
Confirm that the LED indicator turns yellow when the Exposure Switch
is pressed. Ensure that the LED indicator remains yellow for the entire
duration of the exposure.
Daily
Ensure that the power cable is not kinked, broken, exposed, and free of
all other defects.
Daily
Confirm that activating the Emergency Stop Switch ceases the unit’s
operation. Pressing the Emergency Stop Switch should stop all
movement of the equipment and X-ray emission.
Weekly
Ensure that all visible labels are intact and legible. Weekly
Check for damages to the Exposure Switch cable. Monthly
Confirm that the audio message is audible throughout the exposure. Monthly

Table of Contents

Other manuals for Vatech A9

Related product manuals