EasyManua.ls Logo

Vatech Green 16 User Manual

Vatech Green 16
162 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation Manual
Model : PHT-65LHS
Version : 1.49
English
Full Version

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Vatech Green 16 and is the answer not in the manual?

Vatech Green 16 Specifications

General IconGeneral
BrandVatech
ModelGreen 16
CategoryMedical Equipment
LanguageEnglish

Summary

Introduction

Customer's Responsibility

Outlines customer's roles in site planning and preparation for installation.

Manufacturer's Liability

Details conditions under which VATECH assumes liability for installation and operation.

Conventions in this Manual

Explains symbols and warnings used in the manual for user and equipment safety.

Marks and Symbols

Describes various symbols used to indicate hazards, compliance, and device information.

Standards and Regulations

Lists international standards and regulations the equipment complies with.

Choosing an Installation Site

Room Requirements

Details necessary site conditions, visibility, and floor requirements for optimal installation.

Specifications for Electrical Installation

Provides detailed electrical specifications and guidance for installation.

Electrical Requirement

Specifies grounding, power line usage, and AVR recommendation for electrical setup.

Environmental Specifications

Lists operational and storage requirements for temperature, humidity, and pressure.

Exposure Switch Installation Options

Describes three options for installing the exposure switch for user convenience and safety.

Installation Versions

Shows diagrams for base-stand and wall-mount installation types.

Installing the Warning Lamp and Door Interlock Switch

Guides on installing warning lamp and door interlock switch, referring to appendix.

Installing the Emergency Stop Switch

Provides instructions for installing the emergency stop switch for safety.

Before Installing the System

Required Tools

Lists all necessary tools for the installation process.

Checking the ShockWatch and TiltWatch Indicators

Instructions for inspecting shipping damage indicators before opening packages.

Unpacking Boxes

Details the procedure for unpacking the main box and its contents.

Checking the Parts

Guides on verifying all parts and accessories are present using the layout and list.

Installing the Equipment: Base Stand (Optional)

Assembling the Base and Main Units

Step-by-step guide to assemble the base and main units of the equipment.

Installing the CEPH Unit (Optional)

Instructions for installing the optional CEPH unit.

Installing the Wall and Column Brackets

Details on installing wall and column brackets for mounting.

Fixing the Base (Optional)

Procedures for fixing the base onto concrete or wooden floors.

Connecting the Cables to the Equipment

Instructions for connecting various cables to the equipment.

Removing the Transportation Safety Bolts

Step-by-step guide to remove safety bolts used during transportation.

Leveling the Equipment

Procedures for leveling the equipment using a spirit level for stability.

Tightening the Bolts

Final step to tighten bolts after leveling the equipment.

Installing the Equipment: Wall Mount

Installing the Equipment

General guidance for installing the equipment using the wall mount option.

Installing the Wall and Column Brackets

Details on installing wall and column brackets for wall-mount setup.

Connecting the Cables to the Equipment

Instructions for connecting cables to the equipment for wall mount.

Removing the Transportation Safety Bolts

Steps to remove transportation safety bolts for wall mount.

Leveling the Equipment

Procedures for leveling the equipment for wall mount installation.

Tightening the Bolts

Final step to tighten bolts after leveling for wall mount.

Completing Miscellaneous Works

Assembling Various Covers

Instructions for assembling base cover and base front cover.

Assembling the Temple Supports and the Chinrest

Steps for attaching temple supports and chinrest to the unit.

Installing the Switch Holders

Guides on installing UP/DOWN and Exposure Switch Holders.

Setting Up PC

Direct Connection Diagram

Illustrates the connection diagram for the system components and PC.

The Recommended PC Requirements

Lists the minimum hardware and software specifications for the PC.

Disabling Windows Defender

Steps to disable Windows Defender for software compatibility.

Installing the Internal Peripherals

Guides on installing internal PC peripherals like the frame grabber board.

Connecting the Cables to PC

Instructions for connecting various cables from the equipment to the PC.

Setting Up PC Environment Variables

Before Beginning

Prepares the PC and system for environment variable configuration.

Turning off the Firewall

Steps to disable the Windows Firewall to prevent interruptions.

Setting up the Power Management Options

Configuration to disable screen saver and set power options for system stability.

Turning off the User Account Control

Steps to turn off User Account Control (UAC) for smoother operation.

Setting Folder Exclusions with Anti-virus Software

Excludes necessary files and folders from anti-virus scans.

Installing Software

Before Beginning

Prepares the PC by turning off the emergency stop and checking drivers.

Software Installation Flow

Provides a flowchart illustrating the software installation sequence.

Installing the Image Viewer Program

Instructions for installing the image viewer program.

Installing the Install-Package

Guides on installing the main software package via USB.

Configuring User Information

Steps to configure user information and settings for imaging programs.

Disabling the Packing Mode

Instructions to disable packing mode for the equipment to function.

Selecting an Announcement Mode (Optional)

How to select announcement modes (music/beep) for the equipment.

Technical Specifications

Mechanical Specifications

Provides detailed mechanical dimensions and specifications of the equipment.

Electrical Specifications

Lists electrical specifications including voltage, frequency, and power rating.

Environmental Specifications

Outlines the environmental conditions for operation, transport, and storage.

Appendix

Installing the Warning Lamp and Door Interlock Switch

Detailed guide for installing warning lamps and door interlock switches.

Installing the Emergency Stop Switch

Instructions on properly installing the emergency stop switch.

Limiting the Column Height

Procedure to limit the column height based on ceiling constraints.

Connecting the 3rd party Exposure Switch (Optional)

How to connect a third-party exposure switch.

Checking PC BIOS Settings

Guide to check and configure PC BIOS settings for optimal performance.

Installation Checklist

A comprehensive checklist for installation and site preparation.

Related product manuals