4. Installing the Equipment: Base Stand (Optional)
Green 16/18 Installation Manual 65
4.7 Leveling the Equipment
T-shaped Hex Wench 8 mm / 0.3”
Sprit Level n/a
4.7.1 Getting Started
To prepare the equipment for the leveling procedure, follow the steps below:
1. Prepare the Spirit Level.
2. Turn the Rotating Unit clockwise so that the X-ray tube head faces the front, as
shown in the figure.
3. Turn all eight screws on the base plate unit clockwise until they touch the
ground.