EasyManua.ls Logo

Vatech Green 16 - Leveling the Equipment

Vatech Green 16
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Installing the Equipment: Base Stand (Optional)
Green 16/18 Installation Manual 65
English
4.7 Leveling the Equipment
T-shaped Hex Wench 8 mm / 0.3
Sprit Level n/a
4.7.1 Getting Started
To prepare the equipment for the leveling procedure, follow the steps below:
1. Prepare the Spirit Level.
2. Turn the Rotating Unit clockwise so that the X-ray tube head faces the front, as
shown in the figure.
3. Turn all eight screws on the base plate unit clockwise until they touch the
ground.

Table of Contents

Related product manuals