EasyManua.ls Logo

VeriFone Forecourt Controller Interface - Page 27

VeriFone Forecourt Controller Interface
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Forecourt Controller Interface Installation Guide 19
August 11, 2016
3. Locate the four screws (P/N SCR-0001) provided with the RS485 Board
kit.
4. Position the RS485 board over the mounting posts in location 1 above.
Secure the board to the posts using the four screws.
5. Repeat these steps to install additional boards, installing the boards in
locations 2, 3, and 4 as shown in the picture in step 2 above.
Jumper Settings for RS485 Boards
JP3—Connects signal ground (GND) to chassis ground (default is
connected)
Note: The jumper settings should not be changed.

Related product manuals