EasyManuals Logo

Vertiv VRC1 Series Installer/User Guide

Vertiv VRC1 Series
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background imageLoading...
Page #41 background image
Appendix B: Preventive Maintenance Checklist
Inspection Date ___________________ Prepared by: _________________________________
Model # ___________________ Serial Number # _________________________________
During regular maintenance, print this checklist and mark each item as it is confirmed "completed." If
necessary, refer to the procedure steps in Regular and Preventive Maintenance on page29, to complete
the item.
Monthly Maintenance Checks
Completed Item
Verify that air flow is not restricted.
Make sure that the air filter is clean. Clean the filter if needed.
Unit is oriented correctly in the rack cabinet: cool, supply air is at the front and hot, return air is at the back.
Foreign materials are removed from the area (shipping material, packaging, tools, etc.)
Condensate-drain piping is properly connected.
Check the condensate-drain connection and piping for leaks.
Make sure there are no clogs in the condensate-drain line.
If a condensate-drain pump is used with the drain line, make sure there are no clogs or leaks at the pump.
37

Other manuals for Vertiv VRC1 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vertiv VRC1 Series and is the answer not in the manual?

Vertiv VRC1 Series Specifications

General IconGeneral
BrandVertiv
ModelVRC1 Series
CategoryFreezer
LanguageEnglish

Related product manuals