EasyManua.ls Logo

VEVOR ALK-T2 - Equipment Maintenance; Maintenance Menu

VEVOR ALK-T2
51 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 34 -
Replace
electrodes
3.1 Arc Correction
It is strongly recommended that the fusion splicer
should be calibrated after a change in the type of fiber,
a system upgrade, a large change in the temperature,
humidity and air pressure of the environment,
continuous fusion failures or high losses, long periods
of non-use of the fusion splicer or excessive use of the
electrodes, cleaning or replacement of the electrodes.
Otherwise the splicing effect will be affected.
The procedure for arc calibration is as follows.
(1) SelectArc correctionin theMaintainmenu.
(2) Place the cut fibers in the fusion splicer and close
the wind cover.
(3) Press the start button to execute .
(4) If the display indicates "Discharge current too high"
or "Discharge current too low", repeat (2) and (3) above
until the arc correction is successful.
(5) If " arc correction failed" is indicated, start again with
step (1).
3.2 Electrodes Maintenance
Note: Do not touch the tip of the electrode with a hard object
when replacing it to avoid damaging it and affecting the
splicing effect.
The electrodes will be worn out by use, please replace them
in time, otherwise the splicing effect of the fibers will be
Clean
electrodes
(1)ChooseClean electrodesin
Maintainmenu.
(2)Press the Start button and the fusion
splicer automatically

Related product manuals