5.1 Checking the scope of delivery
Unpack the machine and ensure that you have
received the following items:
1 2
3 4 5 6
7 8 9 10
11 12 13 14
15 16 17 18
19
1. 1 x Machine R5
2. 1 x Spindle service set
3. 1 x Power cable
4. 1 x Ethernet network cable (type: straight)
5. 1 x Pneumatic hose
6. 1 x Torque wrench (1.8 Nm) (for mounting blocks)
7. 1 x Hex key (2.5 mm)
8. 1 x Crevice nozzle (for cleaning the working chamber)
9. 1 x Interdental brush (for cleaning the nozzle plate)
10. 1 x Cleaning brush
11. 1 x Drill bit (2.8mm) for tool positions
12. 1 x Tool magazine insert
13. 1 x Calibration set: 1 micrometer, 6 blanks for man-
ufacturing test and calibration specimen
14. 1 x Measuring pin
15. 1 x Block holder
16. 1 x Container with activated carbon pellets, sufficient for 3
months (approx.)
17. 1 x Fine filter
18. 1 x Microfiber cloth
19. 1 x Maintenance set for the blank holder: 1 gasket, 2 valves,
4 oval-head screws (M5 x 12), 1 TX25 screw driver
Not depicted:
n
This document
n
1 x Carrying aid for transporting the machine
n
1 x Transport lock in the working chamber
n
1 x Supplement about removing the carrying aid
and transport lock
n
1 x Set of cover caps, diameter 7.5 mm
n
1 x Set of cover caps, diameter 9.5 mm
n
1 x Grub screw
n
3 x Bag with Tec Powder for cleaning the cooling
liquid system (50g per bag)
Keep the packaging of the machine, the carrying aid
and the transport lock for future transports.