COMPONENT TEST PROCEDURE METER READING
PTC START The PTC Start Relay cannot be
RELAY tested. To determine its reliability,
use the following procedure:
1. Measure the R and W wires at
The compressor for 120 volts AC.
2. Check the overload relay to make
sure there is continuity through
It. (Use the previous test proced-
ure.)
3. Test the run capacitor. (Use the
following test procedure.)
4. Use a test cord and start the com-
pressor. If it starts, and the pre-
ceding checks are okay, the relay
Is defective.
RUN Disconnect the wires and touch the The ohmmeter reading should peak
CAPACITOR ohmmeter probes to the two terminals. and then drop. Reverse the test
probes on the terminals and the
Same results should occur.
TIMER To test the timer, perform the follow-
ing steps:
NOTE: The 1. Use a screwdriver and manually
production turn the time clockwise until you
timer (Paragon) hear a “click.” This will place
has a 10 hour the timer in the “defrost” position
cumulative if the refrigerator was running,
run time with the compressor and fans will
a 21 minute turn off.
Defrost 2. Unplug the unit.
duration. 3. Disconnect the 4 wire connector
The service re- from the timer.
placement timer 4. Set the ohmmeter to the Rx10k.
(Mallory) has
an 8 hour Checking the Motor:
cumulative run
time with a 21 1a. Paragon Timer: The motor wind- Paragon Timer - When you first touch
minute defrost ings have a capacitor connected the terminals the meter should momen-
duration. In series. Use the same procedure tarily deflect and show continuity.
that you would use for checking a
capacitor. Momentarily touch the
probes to terminals PK and R,
then reverse the probes and touch
the terminals again.
39