25
Load control
Setting load priorities
This function lets you change the order in which the individual loads, previously set via the control unit during
configuration in the load control module, are cut off when necessary.
• Tap and to select the load whose priority you want to change and with and you
assign the new priority.
To confirm the settings made, tap .