USER SETTINGS
32 DE5468U
A. If 12h format is desired, continue as follows:
PRESS
RESULTANT DISPLAY
US FORMAT - 12H
(if this is the current option)
TIME _ _ : _ _ A
TIME 12:55A
(time
digits] (e.g.
12:55A)
TIME HH:MM A
Note: To enter “A” - press [
] or to enter “P” - press [#].
B. If 24h format is desired, continue as follows:
PRESS
RESULTANT DISPLAY
US FORMAT - 12H
EU FORMAT - 24H
TIME _ _ : _ _
TIME 19:55
[time
digits] (e.g.
19:55)
TIME 19:55
TIME HH:MM
You may now select any other item on the USER
SETTINGS menu or quit programming by clicking
. When <OK> TO EXIT is displayed - click
.
Setting the Date and Date Format
Having entered your Master User Code successfully
(see above - Entering the User Settings Menu), click
button (repeatedly, if necessary) until
the display will read SET DATE&FORMAT.
From here, proceed as follows:
PRESS
RESULTANT DISPLAY
DATE MM/DD/YYYY
DATE DD/MM/YYYY
If not satisfied
press
DATE _ _ / _ _ /_ _ _ _
DATE 01/01/2002
[Enter date]
(e.g.
01/01/2002)
DATE 01/01/2002
DATE DD/MM/YYYY
You may now select any other item on the USER
SETTINGS menu or quit programming by clicking
. When <OK> TO EXIT is displayed - click
.
Defining PWRLNK (PowerLink)
This mode enables you to enroll/delete the
PowerLink (PowerMax Pro Web based remote
system) and to enable/disable PowerLink failure
reporting. The procedure is shown in figure 8.
Note: The partition feature is supported only by
specific versions of the PowerLink.
A. Enrolling PowerLink
Having entered your Master User Code
successfully
(see Entering the User Settings Menu), click
repeatedly until the display reads:
DEFINE PWRLNK
Click to change the display to:
1: INSTALL
Click to change the display to:
<OK> to install
Click to perform the enrolling (success is
accompanied by short beeps, failure by long beep).
B. Deleting PowerLink
The procedure is similar to that described in step A,
but instead of "<OK> to enroll", the display shows:
<OFF> to delete
The black rectangle at the right side indicates that the
PowerLink is enrolled. Click
to delete the
PowerLink.
C. Enabling PowerLink Failure Reporting
Perform the actions described in step A above until
the display reads:
1: INSTALL
Click to change the display to:
2: PWRLNK FAILURE
Click to change the display to:
disable report