Installation and Operating Manual / Version 10 / 3626-011500
en
/ Protection class 0: public / 2017-12-15
33
BTS, non-contacting thermal switch unit
Maintenance, Servicing
Switch off the unit in which the turbo coupling is installed and secure the switch
against inadvertent switch-on.
For all work performed on the turbo coupling ensure that both the drive motor and
the driven machine have stopped running and that a re-start is absolutely
impossible!
Components may only be replaced by original spare parts.
Re-mount all protective covers and safety devices in their original position immediately
after completion of the servicing and maintenance work. Check them for proper
functioning.
Maintenance schedule:
Time
Maintenance work
Every 1000 operating hours
every 6 months at the latest
Inspect the machine for irregularities
(visual inspection, dust deposits).
6 months after commissioning, at the latest,
then every 2 years
Check the electrical system for sound condition
(detailed inspection).
In case of impurities
Cleaning ( Chapter 9.1).
Table 9
Carry out any maintenance work and routine inspections according to the report.
Record the maintenance work carried out.