EasyManua.ls Logo

Volvo Penta D13 - After Shutdown Checks and Break Precautions

Volvo Penta D13
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
After Engine Shutdown
Check the engine and engine bay for leakages.
Close the fuel tap.
Close the sea cock where fitted.
Take an hour meter reading and carry out
preventive maintenance according to the
maintenance schedule.
Turn off the main switches before any long
stoppage.
NOTICE! Do not turn off the main switches within 45
seconds after turning off the ignition. This in order to
save engine data to the engine control unit and ACM
unit to drain the EATS system from urea solution.
Engine Shutdown
47710406 10-2018 © AB VOLVO PENTA 43

Table of Contents

Related product manuals