wc_tx000639gb.fm
27
CRT 36 Operation
3.11 Pitch Adjustment
When changing or setting the pitch (angle) of the trowel blades, slow the machine,
set the desired pitch on the left side of the machine, then adjust the right side to
match.
To increase pitch: Rotate the left pitch control (L) clockwise, rotate the right pitch
control (R) counterclockwise.
To decrease pitch: Rotate the left pitch control (L) counterclockwise, rotate the right
pitch control (R) clockwise.
3.12 Emergency Shutdown Procedure
Procedure
If a breakdown or accident occurs while the machine is operating, follow the
procedure below:
1. Stop the engine.
2. Close the fuel valve.
3. Remove the machine from the job site using the wheel kit.
4. Clean concrete from the blades and the machine.
5. Contact the rental yard or machine owner for further instructions.
Working Conditions
of Concrete
Suggested Working
Pitch
1. Wet surface working stage
Flat (No Pitch)
2. Wet to plastic working stage
Slight Pitch
3. Semi-hard working stage
Additional Pitch
4. Hard finishing stage
(burnishing)
Maximum Pitch