EasyManua.ls Logo

Wacker Neuson ET42

Wacker Neuson ET42
306 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA E19 en* 1.0 * E19_10_400.fm 4-47
Putting into operation 4
Battery master switch
NOTICE
Possible damage to the electronics due to improper actuation of the
battery master switch.
Do not operate the battery master switch with a running engine.
After stopping the engine, press the battery master switch after 70
seconds at the earliest.
Actuate the battery isolator switch:
If the vehicle is parked for longer periods of time (e.g. over the
weekend).
If the vehicle is to be protected against unintentional taking into
service.
If required by national and regional provisions.
The battery master switch is located under the left maintenance cover.
Fig. 120
1
2
Power supply Key position
Connection 1
Interrupt 2 (Remove key)

Table of Contents

Related product manuals