EasyManua.ls Logo

Wacker Neuson ET42

Wacker Neuson ET42
306 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA E19 en* 1.0 * E19_10_510.fm 5-47
Operation 5
1. Start engine and lower the control lever base.
2. Move the attachment inward completely and lower it about 5–10 cm
(2–4 in) above the ground.
3. Pull lock A down.
4. Press switch B down.
The symbol Hydraulic quickhitch enabled appears and the buzzer
sounds.
5. Press touch button C within 10 seconds.
The quickhitch opens.
Check pin D must be fully extended.
A
Fig. 195
B
C
Fig. 196
Fig. 197
Fig. 198
D

Table of Contents

Related product manuals