BA E19 en* 1.0 * E19_10_400.fm 4-19
Putting into operation 4
1. Stop and park the vehicle. Stop the engine. See “Preparing
lubrication”.
K: mounting points top left and right.
2. Attach screws L and nuts M and tighten with 110 Nm (81 ft. lbs.).
P: mounting points bottom left and right.
3. Install screws Q and tighten to 110 Nm (81 ft.lbs.).
Put caps on all screws and nuts.
Fig. 97
Fig. 97 (symbolic representation)