EasyManua.ls Logo

Wacker Neuson ET42

Wacker Neuson ET42
306 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA E19 en* 1.0 * E19_10_400.fm 4-19
Putting into operation 4
1. Stop and park the vehicle. Stop the engine. See “Preparing
lubrication”.
K: mounting points top left and right.
2. Attach screws L and nuts M and tighten with 110 Nm (81 ft. lbs.).
P: mounting points bottom left and right.
3. Install screws Q and tighten to 110 Nm (81 ft.lbs.).
Put caps on all screws and nuts.
Fig. 97
Fig. 97 (symbolic representation)
Fig. 98
L
M
K
Fig. 99
Q
P

Table of Contents

Related product manuals