EasyManua.ls Logo

Wacker Neuson HI 110HD D

Wacker Neuson HI 110HD D
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HI 110 / 200 / 300 Labels
ghi_si000464gb.fm 17
M WARNING
Licensed gas technician required.
Natural gas / liquid propane burner setup and
installation, fuel supply connection, test
firing, and burner adjustment MUST be
performed by a LICENSED professional gas
technician and must conform to the
requirements of all relevant local, state,
provincial, and Federal authorities.
Failure to heed this warning may result in an
explosion and/or fire causing property
damage, personal injury, or death.
N Creating Green Environments
This product may help you earn credits
toward LEED® EQ 3.1 and 3.2 certification.
P DIRECTIONS FOR OPERATION:
1. Connect the machine to 120V power sup-
ply using a 12/3 x 50 foot max. 10/13 x
100 foot max. extension cord.
2. Wait 20-30 minutes to allow the oil filter to
pre-heat the fuel.
3. Turn the machine on:
a. Continuous heat mode (I) or
thermostat mode (II)
b. If available, select high or low fire
mode.
4. To turn off, switch to (0) position.
WARNING
If three consecutive attempts to reset the
machine are unsuccessful, then troubleshoot
the heating system for the root cause(s) of
the lockout.
Make necessary repairs or adjustments to
ensure a safe start condition.
Ensure that the heat exchanger is free of
oil and oil vapors before starting or reset-
ting the burner.

Table of Contents

Related product manuals