EasyManua.ls Logo

Wacker Neuson HI 110HD D

Wacker Neuson HI 110HD D
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HI 110 / 200 / 300 Operation
ghi_tx001447gb.fm 33
4.12 Pre-Starting Checks
Requirements
Machine properly positioned
Power connected to the machine
Checks
Before starting the machine, check the following items:
Result
The machine is ready to turn on.
Item Task
Fuel sight gauge (if equipped) Check that the fuel tank is full (if applicable).
Fuel tank cap Check that the fuel tank cap (if applicable) is
secure.
Operation mode switch Check that the operation mode switch is in the
OFF position.
Main control panel Check that proper power supplies have been con-
nected at the main control panel. See topic
Connecting Power to the Machine.
Remote thermostat (if installed) Check that the remote thermostat has been cor-
rectly installed. See topic Installing the Remote
Thermostat or Thermostat Receptacle Plug.
Ducts and duct adapters Check that all ducts and duct adapters have been
properly installed. See topic Installing the Heater
Duct.

Table of Contents

Related product manuals