EasyManua.ls Logo

Wacker Neuson HI 110HD D

Wacker Neuson HI 110HD D
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HI 110 / 200 / 300 Burner Setup
ghi_tx001449gb.fm 43
7. Conduct a smoke spot test. Follow the smoke spot tester manufacturer’s
instructions and the general guidelines below.
Use the access hole in the exhaust stack.
Several samples should be taken as the heater warms.
The final sample should be taken just before the heater reaches 71°C (160°F).
8. Analyze the combustion. Follow the combustion analyzer manufacturers
instructions and the general guidelines below.
Use the access hole in the exhaust stack.
Take several samples as the heater warms.
Take the final sample just before the heater reaches 71°C (160°F).
9. Re-adjust the air band, if necessary, until the smoke spot test and combustion
analysis are within the following parameters:
O
2
content: 3–5%
Smoke spot: less than 1
Result
The burner has now been set.
HI Heater
ghi_gr007395

Table of Contents

Related product manuals