Operation LTS
Continued from the previous page.
7. With the main circuit breaker on, switch each individual circuit breaker for the
lights to the ON position, one at a time.
8. Consider that the lamps will take up to 5 minutes to reach operational
temperature and lighting levels (valid for metal halide and halogen versions). If
the lights are shut down, they require a cool down period of approximately 10
minutes before they can be switched on again.
9. Close the control panel cover and keep it closed when not in use, in order to
protect the controls.
10.If a light is not illuminated, check the bulb or the mast wiring.
Closing down the unit requires this same procedure in reverse. We recommend to
switch off the lights before lowering the tower, allowing them to cool.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson LTS4K and is the answer not in the manual?

Wacker Neuson LTS4K Specifications

General IconGeneral
BrandWacker Neuson
ModelLTS4K
CategoryWork Light
LanguageEnglish

Related product manuals