EasyManua.ls Logo

Wallgate Thrii SS - 6.7 Commissioning for use

Wallgate Thrii SS
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21 | P a g e
Wallgate Thrii®
PRODUCT MANUAL Issue 5_3
ORIGINAL INSTRUCTIONS
© 2013 Wallgate Ltd.
6.7 Commissioning for use
To commission the Wallgate Thrii:
1. Ensure the engine cover is securely fitted and the electrical plug is fully pushed in.
2. Fully open the mains water supply isolating tap. Check the system for external leaks, if ok, open
the tap on the support frame.
3. Close the fascia, ensuring it closes fully against the wall. Adjust the hinges if required and push the
fascia to the closed position ensuring the locking bar engages fully.
The unit should only be operated with the fascia in the fully closed position and the waste
outlet engaged. Failure to do so may result in leakage.
4. Switch ON the fused spur, this will power-up the Wallgate Thrii ready for use.
5. Upon initial power-up the Wallgate Thrii automatically runs through a 15 second water calibration
cycle. This is repeated everytime the mains power supply is interrupted. This will also activate the
clock on the LCD.
6. Reopen the fascia using the key provided.
Important! A range of compatible liquid soaps & specifications are available from Wallgate.
7. To install the soap container, place the soap container into its stowage position, to the right of the
engine unit Fig.17a, ensuring the cap is outer most.
Fig.17(a) Fitting the container (b) Cap removal (c) Installing the push-fit cap/tube