EasyManua.ls Logo

Waters Xevo TQ-S User Manual

Waters Xevo TQ-S
278 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Waters Xevo TQ-S
Mass Spectrometry
System
Operators Overview and Maintenance Guide
715002212 / Revision C
Copyright © Waters Corporation 2014
All rights reserved

Table of Contents

Other manuals for Waters Xevo TQ-S

Question and Answer IconNeed help?

Do you have a question about the Waters Xevo TQ-S and is the answer not in the manual?

Waters Xevo TQ-S Specifications

General IconGeneral
BrandWaters
ModelXevo TQ-S
CategoryLaboratory Equipment
LanguageEnglish

Summary

Waters Xevo TQ-S Overview

Waters Xevo TQ-S

General description of the tandem quadrupole, atmospheric pressure ionization mass spectrometer.

Preparing the Mass Spectrometer for Operation

Starting the mass spectrometer

Step-by-step instructions for powering on the mass spectrometer and its components.

Tuning and calibration information

Procedures for tuning and calibrating the instrument before use.

Changing the Mode of Operation

ESI mode

Instructions for preparing the mass spectrometer for ESI operation.

Maintenance Procedures

Maintenance schedule

Table listing periodic maintenance schedules for optimal performance.

Safety and handling

General safety considerations for performing maintenance procedures.

Preparing the instrument for working on the source

Procedure to follow before working on the instrument's source.

Replacing the ESI probe sample capillary

Procedure for replacing a blocked, contaminated, or damaged sample capillary.

A Safety Advisories

Warning symbols

Explanation of hazard symbols and associated risks for instrument operation.

B External Connections

Connecting the Oerlikon Leybold oil-filled roughing pumps

Procedure for connecting two identical Oerlikon Leybold oil-filled roughing pumps.

Related product manuals