EasyManua.ls Logo

Wayne P250 - Page 15

Wayne P250
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
64659-001 REV. A 07/06/18
15
Table 5 - Orifice Sizes and Approximate Air Shutter Settings to Achieve a Given Firing Rate
Natural gas
Propane gas
Btu/hr
Letter/
Decimal
(in.)
Air
shutter
Btu/hr
Letter/
Decimal
(in.)
Air
shutter
Number
Number
50,000
1/8
0.1250
0.50
50,000
45
0.0820
0.25
60,000
30
0.1285
0.50
60,000
44
0.0860
0.50
65,000
29
0.1360
0.50
65,000
43
0.0890
0.50
70,000
28
0.1405
0.50
70,000
3/32
0.0940
0.75
75,000
26
0.1470
0.50
75,000
40
0.0980
1.00
80,000
24
0.1520
0.50
80,000
37
0.1040
1.00
85,000
5/32
0.1562
0.50
85,000
36
0.1065
1.25
100,000
17
0.1730
1.00
100,000
35 (7/64)
0.1100
1.25
110,000
14
0.1820
1.25
110,000
31
0.1200
1.50
120,000
10
0.1935
1.50
120,000
3.1 mm
0.1220
1.50
130,000
7
0.2010
1.50
130,000
1/8
0.1250
2.00
140,000
5 (13/64)
0.2055
1.75
140,000
30
0.1285
2.50
150,000
4
0.2090
2.00
150,000
29
0.1360
2.75
160,000
3
0.2130
2.50
160,000
28 (9/64)
0.1405
2.75
170,000
1
0.2280
2.75
170,000
27
0.1440
3.00
175,000
A
0.2340
2.75
175,000
26
0.1470
3.00
185,000
B
0.2380
3.00
185,000
25
0.1500
3.25
190,000
C
0.2420
3.00
190,000
24
0.1520
3.25
200,000
E (1/4)
0.2500
3.25
200,000
22 (5/32)
0.1570
3.50
210,000
F
0.2570
3.50
210,000
20
0.1610
3.75
220,000
G
0.2610
3.75
220,000
19
0.1660
4.00
230,000
H
0.2660
4.00
230,000
18
0.1695
4.25
240,000
I
0.2720
4.00
240,000
11/64
0.1720
4.25
250,000
J
0.2770
4.25
250,000
16
0.1770
4.50
This table shows the recommended orifice sizes and air shutter settings based on Btu/hr required. For example, an
application running propane gas that needs 157,000 Btu/hr would use an orifice drilled with a #28 drill bit. This orifice would
have a 0.1405” hole. The air shutter would be set to the 2.75 position.

Other manuals for Wayne P250

Related product manuals