EasyManua.ls Logo

Weber SRV 66 - Maintenance Survey; Initial Maintenance

Weber SRV 66
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SRV62_66 19
3.2 Maintenance Survey
Any maintenance work which must be performed on the tamper is listed in two charts. The first chart (paragraph 3.2.1)
indicates the initial maintenance work which has to be carried out once at a certain time after commissioning. The
routine maintenance work indicated in the second chart (paragraph 3.2.2) has to be repeated at regular intervals.
Both charts have the same lay-out. The column "Maintenance Interval" indicates the time or the operating hours at
which (after which) the maintenance work must be done.
The column "Maintenance Item" refers to the assembly group on which the work indicated in the column "Maintenance
Work" must be carried out.
The column "Remarks" contains cross-references on paragraphs of these operating and maintenance instructions or
other documentation in which the maintenance work is described in detail.
3.2.1 Initial Maintenance
Maintenance
Interval
Maintenance
Item
Maintenance Work Remarks
After the first 20
operating hours
Engine - Change the engine oil # 3.3.1
After the first 50
operating hours
Lower tamper part - Change the oil # 3.3.5
Whole tamper - Check all screwed connections for tight
seat, retighten them if necessary
RAMIRENT

Related product manuals