EasyManua.ls Logo

WeiderPro Pro 4500 - Page 16

WeiderPro Pro 4500
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
17. Apply grease to an M8 x 19mm Shoulder Bolt
(65). Attach the Arm Cable (54) to the indicated
Cable Pivot (39) with the Shoulder Bolt and an
M8 Locknut (58). Make sure that the Cable
c
an pivot freely around the Shoulder Bolt.
17
58
6
5
54
39
G
rease
18. Identify the High Cable (55). Route the High
Cable up through the Top Frame (4) and over a
90mm Pulley (48). Attach the Pulley inside of
the Top Frame with an M10 x 80mm Bolt (71),
two M10 Washers (57), two 19mm Spacers
(33), and an M10 Locknut (56).
19. Route the High Cable (55) over a 90mm Thin
Pulley (47) and down through the Top Frame
(4). Attach the Thin Pulley inside of the Top
Frame with an M10 x 80mm Bolt (71), an M10
Washer (57), and a 19mm Spacer (33). Make
sure that the Thin Pulley does not fall out of
the Top Frame while you complete steps 20
and 21.
18
19
56
4
55
33
33
57
57
48
71
4
55
33
57
47
71

Other manuals for WeiderPro Pro 4500

Related product manuals