EasyManua.ls Logo

Wellsys i16 - Page 28

Wellsys i16
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
i16 Manual Page 28 - Revision: 2-09-2023
D. Turn the water on for 30 minutes or longer.
6. With the 60PSI going into the system after 30 minutes, the TDS of the water should be
reduced approximately 98% after the RO membrane vs. the incoming tap TDS.
7. The TDS after the TCR Filter should only be 5-8 points higher
A. As the system is flushing during each step, inspect for any leaks and/or loose
connections.
8. Sanitize the Ice Bin and Water Reservoir (Full Sanitizing Guide on page 37)
A. Remove the top lid by removing two screws on the back side of the top panel.
B. Remove the top panel.
C. Remove the front panel by removing two screws found behind the drip tray.
D. Remove the ice and water spigots.
E. Slide the front panel off.
F. Remove the screws to be able to access the ice tank.
G. Remove the lid to the ice tank with the insulation included.
H. Remove the stainless-steel augers and the plastic bottom to the ice tank.
I. Spray the inside of the tank with hydrogen peroxide and wipe out with a clean paper
towel.
J. Hydrogen peroxide should be approximately a 20% hydrogen peroxide to 80% water
blend.
K. Spray the plastic bottom with the same blend along with the stainless-steel augers.
L. Reinstall the plastic bottom and the augers.
M. Do one more light spray of hydrogen peroxide and put the top back on along with the
insulation and screws.
N. Remove the lid to the water reservoir.
O. Spray the inside of the reservoir in the same way and wipe out.
P. Spray a light mist and then put the lid to the reservoir back on.
Q. Reinstall the front panel and the top panel.
9. Connecting the Filters to the i16 (a 3-4 gallon bladder tank must be used as well).
A. Mount the filter enclosure under the sink.
B. Attach the supply line to the water supply input on the filter enclosure.
C. Attach the RO drain line to the RO drain connection on the filter enclosure.
D. Connect the feed line from the filter enclosure to a tee.
E. Connect the tee to the bladder tank and the other end to the i16 supply line.
10. Ensure that the pressure of the bladder meets the manufacturers recommended pressure
before allowing it to fill.
A. Listen for the compressor and the auger running.
B. Wait about 30-60 minutes for ice to be used after it starts making ice.
C. You must wait until the hot tank completely fills before turning on the hot water switch,
which is located on the back of the system behind the caution sticker (lower right side).