Marine Installation Manual 2021-08 5
List of Changes
X72DF
Revision: 02 Date of issue: 2018-11
Location of change Subject
1.1 Power /speed range Figure 1-1 updated
1.2 Primary engine data Table 1-1: guide feed rate of cylinder oil stated more precisely
1.4 Fuel operating modes Paragraph and illustration added
1.5.1 Torque/power meter requirement Table 1-4 updated
2.1 Pressure and temperature ranges Paragraph rewritten and link name updated
2.2 Engine rating field and power range Whole section updated and restructured
2.5 Electrical power requirement Table 2-4: el. power requirement for UNIC-ECS updated; data for pilot fuel pump added
3.1 Dimensions and masses Table 3-2: mass for connecting rod corrected
3.1.1 Dismantling heights for piston and cylinder liner Links to external documents added
3.2 Engine outline views Links to external documents added
3.3.1 Drawings Paragraph rewritten
3.10 Fire protection Table 3-4: table head rewritten for clarification
4.1 Twin-engine installation Section restructured; more detailed information added
4.2 Cooling water system Whole section updated and restructured
4.3.1 Lubricating oil requirements Link to external document: document name and link name updated
4.3.5 Cylinder lubricating oil system
Alternatives to finished cylinder oils
Changeover between cylinder lubricating oils
Electrical trace heating for system side cylinder LO piping
Section structure changed
Link to external document: document name and link name updated
Information on iCAT updated
Whole section updated with more detailed information
4.3.7 Drain tank
Inclination angles Tables 4-4, 4-5, 4-6 updated
4.4.1 Fuel oil system components
Diesel oil cooler Table: formula corrected
4.4.4 Fuel oil treatment
Centrifugal fuel oil separators Example for throughput capacity calculation corrected
4.4.6 Fuel oil specification Paragraph updated
4.6.3 Gas specifications Table 4-11 updated
4.11.1 Pipe connections Links to external documents added
5.4.2 Recommended manoeuvring characteristics
FPP manoeuvring steps and warm-up times
CPP manoeuvring steps and warm-up times
Paragraph reworded for clarification
Table 5-2: table caption changed
Paragraph reworded for clarification
Table 5-3: table caption changed
5.6.2 Signal processing Link to external document changed
6.7 Countermeasures for dynamic effects New link to external document replaces former tables 6-1 & 6-2
7.1.2 Selective catalytic reduction
Low-pressure SCR Figure 7-2 changed
9 Appendix
9.2 List of acronyms
Restructured
Updated