EasyManua.ls Logo

Winnebago Aspect - Page 75

Winnebago Aspect
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7-17
SECTION 7 –
PLUMBING
Set Up Winterization Valves
2. Turn Water Heater Bypass valve to BYPASS
position (to avoid filling water heater with
antifreeze).
.
3. Remove and save the protective cap from the
end of the antifreeze siphon tube
(see the “Water System Drain Valve
Locations” chart at the end of this section for
location on your model).
4. Insert the end of the antifreeze siphon tube
into a pail or container with 2 to 3 gallons of
non-toxic RV antifreeze solution.
5. Turn Winterization valve so that it points
toward the antifreeze siphon tube.
NOTE: Ensure that all drain valves are
CLOSED before pumping RV antifreeze
into the water system.
Refer to the “Water System Drain Valve
Locations” chart at the end of this
section for valve locations on your
model.
Fill Lines
6. Turn the Water Pump switch ON.
7. Open each hot and cold water faucet handle/
knob in the coach – one at a time each in turn
until antifreeze solution just begins to flow
from the faucet, then close.
Do not forget exterior shower/wash station
knobs (if equipped).
8. Press the toilet flush pedal and hold until
antifreeze begins flowing into the toilet.
Leave small amount of antifreeze that remains
in the bowl.
Water Heater Bypass Valve
(See “Water System Drain Valve Locations” chart at
the end of this section for location on your model)
-Typical installation shown
Antifreeze Siphon Tube and Winterization Valve
(See “Water System Drain Valve Locations” chart at
the end of this section for location on your model)
-Typical installation shown
Antifreeze Siphon Tube
Insert into container of RV
water system antifreeze.
Winterization Valve
•Point toward
antifreeze siphon
tube for winterizing.

Table of Contents