GMZ-E Operating manual Page 21 of 31 B0668
The operator is required to regularly check and maintain all
protection, safety, and monitoring facilities.
After every repair, the flawless condition of the pump unit must
be ensured by means of a test run.
5.8 Disclaimer
Should any damage be caused to persons, objects, the environment and/or property due to
the non-observance of this operation manual, no matter whether intentionally or
unintentionally, WOERNER shall be held harmless thereof. Besides, all warranty claims will be
rejected. The same also applies to any and all consequential damage.
6. Transportation, installation, commissioning and shutdown
6.1 Transportation
Transport the pump unit to its destination carefully and by using suitable aids (e.g. hand-carts
or the like).
6.2 Unpacking
Lift the pump unit out of its packaging carefully and put it on a stable and plane base.
Note! The pump unit and the components attached in accordance with
the scope of delivery may still contain residues of blue-dyed test oil.
6.3 Setting-up
The pump unit is applicable for the use in closed head barrels.
Lift the pump unit carefully into the lubricant barrel. Auxiliary tools like a hand crane (order no.
590.004-65, data sheet P0312) may alleviate the lifting of the pump. Pay attention that no
power supply line and lubricating line gets damaged.