EasyManua.ls Logo

Wolf CGB-100 - 5. Delivered Condition; Standard Delivery; Standard Boiler Delivery Contents; Required Installation Accessories; Boiler Connection Points

Wolf CGB-100
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 3062555_201804
5. Deliveredcondition/
standarddelivery
Deliveredcondition
Gascondensingboiler
The standard delivery includes:
1 Gascondensingboilerreadytoconnectwiththecasingtted
1 Mounting bracket for mounting on the wall, with installation
accessories
1 Installation instructions
1 Operating instructions
1 Maintenance instructions
1 Trap with hose
1 Maintenance tools
Accessories
The following accessories are required for installation of the
gas condensing centre:
- Balancedueaccessories(seetechnicalinformation)
- Room temperature-dependent or weather-compensated
control
- Condensate drain outlet with hose retainer
- Gasballvalvewithreprotection
- Fittingassemblyforheatingow,heatingreturnandintegral
safety assembly
- Pump assembly with variable speed pump and integral safety
assembly
- Low loss header set for one or two appliances in a cascade
- Dirtlterintheheatingreturn
Boilerconnections
Fig.: Connections with heating circuit connection set (accessory)
Heatingow
G 1½"
Gas connection
R ¾"
Heatingreturn
G 1½"
Condensate
drain
Heatingcircuitpumpassembly(accessory)
Fig.: Pump assembly (accessory)
Heatingow
G 2"
Heatingreturn
G 2"
Trap
Gas tap
Connection
Expansion vessel 1"
Drain&llvalve
Drain&llvalve
Pressure gauge
Safety valve
Modulating
pump

Other manuals for Wolf CGB-100

Related product manuals