EasyManua.ls Logo

Wolf CGB-100 - 22. Testing the Combustion Parameters; Intake Air Testing; Flue Gas Parameter Testing

Wolf CGB-100
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
373062555_201804
22.Testingthecombustionparameters
Testthecombustionparameterswiththeboilerclosed!
Testingtheintakeair
- Remove the screw from the l.h. test port
- Open the gas shut-off valve
- Insert the test probe
- Start the gas condensing boiler and turn the heating water
temperature selector to the emissions test symbol (illumi-
natedringofthestatusdisplayashesyellow)
- Measure the temperature and CO
2
.
In the case of a concentric balanced ue, the ue is not
gas-tight if the CO
2
contentis>0.2%.Theleakmustbe
rectied.
- After the test has been completed, switch the boiler off,
remove the test probe and close the test port. Ensure the
screws are tightly secured.
Fig.: Test ports
Test port
"Flue gas"
Test port
"Inlet air"
Testingtheuegasparameters
Whenthetestportisopen,uegascanes-
capeintotheinstallationroom.Thereisarisk
ofasphyxiation.
- Remove the screw from the r.h. test port
- Open the gas shut-off valve
- Start the gas condensing centre and turn the temperature
selector to the emissions test symbol (illuminated ring of
thestatusdisplayashesyellow)
- Insert the test probe
- Measuretheuegasvalues
- After the test has been completed, remove the test probe
and close the test port again. Ensure the screws are tight-
ly secured.
Fig.: Control unit overview
ON/OFF switch Temperature selector

Other manuals for Wolf CGB-100

Related product manuals