EasyManua.ls Logo

WOLSELEY Beermaster Plus Series - Default Chapter; Table of Contents

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cooling
2
Installation and maintenance
instructions
1. Introduction: Page 3
• Glossary Of Terms
• Health And Safety
• Before Installation
• During Installation & Maintenance
• Interconnecting Pipework
• Refrigerant
2. Planning The Installation: Page 4
• Positioning The Condensing Unit
• How To Gain Access To The Condensing Units
• Positioning The Evaporator
• How To Gain Access To The Evaporators
3. Installing The Units: Page 8
• Mounting The Condensing Unit On A Wall Bracket
• Mounting The Evaporator Unit On A Wall Bracket
4. Pipe Sizing: Page 9
• Using Interconnecting Pipe Sizing Charts
• Cellar Temperature 8°C
• Cellar Temperature 10°C
• Cellar Temperature 12°C
5. Pipework Installation - Supports And Routing: Page 10
6. Brazing: Page 11
7. Expansion Valve Phial Location: Page 11
8. Drainage: Page 11
9. Electrical Supply & Function: Page 12
• Cable Sizing
• Cable Connection / Termination
10. Power Entry To The Condensing Units: Page 12
11. Power Entry To The Evaporators: Page 13
12. Pressure Testing: Page 14
• Pressure Leak Test
13. Evacuation: Page 14
14. Refrigerant Charging: Page 14
15. Approximate Refrigeration Charge: Page 15
16. Commissioning: Page 16
• Final Checks
• Compressor Rotation
17. BMOP Functions: Page 16
18. BMIEP Functions: Page 19
19. Maintenance: Page 23
20. Standards Applied To The Product Range: Page 24
21. Noise Levels: Page 24
• BMOP
• BMEIP
22. Weights: Page 25
23. Sales Outlines: Page 26
24. Electrical: Page 31
25. Guarantee: Page 35