Cooling
2
Installation and maintenance
instructions
1. Introduction: Page 3
• Glossary Of Terms
• Health And Safety
• Before Installation
• During Installation & Maintenance
• Interconnecting Pipework
• Refrigerant
2. Planning The Installation: Page 4
• Positioning The Condensing Unit
• How To Gain Access To The Condensing Units
• Positioning The Evaporator
• How To Gain Access To The Evaporators
3. Installing The Units: Page 8
• Mounting The Condensing Unit On A Wall Bracket
• Mounting The Evaporator Unit On A Wall Bracket
4. Pipe Sizing: Page 9
• Using Interconnecting Pipe Sizing Charts
• Cellar Temperature 8°C
• Cellar Temperature 10°C
• Cellar Temperature 12°C
5. Pipework Installation - Supports And Routing: Page 10
6. Brazing: Page 11
7. Expansion Valve Phial Location: Page 11
8. Drainage: Page 11
9. Electrical Supply & Function: Page 12
• Cable Sizing
• Cable Connection / Termination
10. Power Entry To The Condensing Units: Page 12
11. Power Entry To The Evaporators: Page 13
12. Pressure Testing: Page 14
• Pressure Leak Test
13. Evacuation: Page 14
14. Refrigerant Charging: Page 14
15. Approximate Refrigeration Charge: Page 15
16. Commissioning: Page 16
• Final Checks
• Compressor Rotation
17. BMOP Functions: Page 16
18. BMIEP Functions: Page 19
19. Maintenance: Page 23
20. Standards Applied To The Product Range: Page 24
21. Noise Levels: Page 24
• BMOP
• BMEIP
22. Weights: Page 25
23. Sales Outlines: Page 26
24. Electrical: Page 31
25. Guarantee: Page 35