www.xemex.eu InstallaonManualSmartChargeController pg14
7.5 Commissioning internet pages
Eachcommissioningpagecontains:
•Atle
•Atopmenu(=links)tothesubpages
•Aformwithsengsforthissubpage
7.5.1 Mainsconneconsengs
Themainsconneconsengspagecontainsthefollowingparameters:
•Numberofphases(1/3)
•Max.chargingcurrent(mustbethesameassenginEVcharger)
•Min.chargingcurrent(Minimumcurrentatwhichthecarcancharge,usedinECOmode)
•Timebeforeincreasedstart-upcurrenttakestheeectincaseofavialablechargingcapacity
•Timethattheincreasedchargingcurrentremainsavailablebeforereverngtothesetgridcapacity
•Themethodusedtomeasurethemainscurrent(Currenttransformers/P1)
•CTrao
7.5.2 Metersengs
TheMetersengspagecontainsthefollowingparameters:
•Metertoemulate:dropdownwithsupportedmetertypes:
oEastronSDM72D-M,withModbbusprodotcolRTU
oEMUProfessionalModbusTCP
•IfTCPischosenforModbusprotocol,thefollowingmustbeentered:
oIPaddress
oTCPport
www.xemex.eu InstallaonManualSmartChargeController pg15
•IfRTUisselectedforModbusprotocol,thefollowingmustbeentered:
oRTUdeviceaddress
oRTUbaudrate
oRTUparity
oRTUstopbits
7.5.3 Wisengs
TheWi-FisengspageisusedtoconnecttheSmartChargeControllertothehomerouter.ThisisusedforSWupdatesand
remotecontrol.(=futurefunconality)
1.SelecttheSSIDoftheWinetwork.
2.Enterthepassword.
3.Pressthe"UpdateWiSengs"buon.
Thestatusshowsthecondionoftheconnecon.Onceconnected,theIPaddressisalsodisplayed.