ICAM by Xtralis ICAM Commissioning Guide
www.xtralis.com 1
Table of Contents
1 Introduction to ICAM Commissioning 3
2 The Commissioning Process 5
3 Pre-Commissioning 7
3.1 Before going to the Site 7
3.2 ICAM Commissioning Form - Prerequisites 7
3.3 Once on Site 7
4 System Configuration and Setting Thresholds 9
4.1 IFT Detector Configuration 10
4.2 ILS Detector Configuration 12
4.3 IAS Detector Configuration 13
5 System Integrity Test 15
5.1 Performance-based Smoke Testing 15
5.2 Testing Devices 19
5.3 Documenting Test Results 19
6 Hand Over 21