Jet Pumps
INSTALLATION, OPERATION AND TROUBLESHOOTING MANUAL
INSTRUCTION MANUAL
IM102R11

Questions and Answers:

Xylem Goulds J Series Specifications

General IconGeneral
BrandXylem
ModelGoulds J Series
CategoryWater Pump
LanguageEnglish

Summary

Jet Pumps

Safety Instructions

General Safety Warnings

Covers DANGER, WARNING, CAUTION, and NOTICE symbols for potential hazards.

Electrical Safety Precautions

Emphasizes reading safety instructions before wiring and following electrical codes.

Selecting the Correct Jet Pump System

Shallow Well Jet Pump Types

Details jet pumps for maximum lift of 25', identified by one pipe to the well.

Convertible Jet Pump Applications

Explains convertible pumps for shallow (to 25') or deep wells (over 25') with jet assembly.

Deep Well Jet Pump Types

Describes deep well pumps for lifts greater than 25', requiring two pipes and specific jet assemblies.

Preparing for Installation

General Piping Guidelines

Provides advice on piping materials, installation, and avoiding air traps in suction lines.

Shallow Well Suction Piping Installation

Instructions for installing suction pipes, foot valves, and check valves for shallow wells.

Attaching Shallow Well Adapter

Steps for installing the shallow well adapter onto convertible pumps.

Attaching Suction Piping to Pump

Procedure for connecting suction piping to the pump, emphasizing airtight connections.

Discharge Piping Setup

Guidance on installing discharge piping, including tee/cross tee connections for tanks.

Deep Well Twin Pipe System Installation

Twin Pipe Suction Piping Requirements

Details pipe sizes and recommendations for twin pipe suction systems in deep wells.

Installing Twin Pipe Jet Assembly

Steps for installing the jet assembly, venturi, and foot valve for twin pipe deep wells.

Deep Well Packer System Installation

Packer System Suction Piping

Instructions for suction piping in packer systems, including casing preparation and couplings.

Installing the Packer Assembly

Procedure for soaking, inserting, and sealing the packer assembly into the well casing.

Attaching Suction Pipe to Packer Adapter

Steps for connecting the suction pipe to the packer adapter at the well head.

Deep Well Discharge Piping Requirements

Explains the need for back pressure and pressure control valves in deep well discharge lines.

All Systems Setup and Priming

HydroPro Water Systems Tank Installation

Guidance on installing Goulds Water Technology HydroPro water system tanks.

Priming a Shallow Well System

Detailed procedure for priming shallow well jet pumps, including venting.

Priming a Deep Well System

Instructions for priming deep well jet pumps, emphasizing complete prime before operation.

Powering the Motor

Voltage Change Procedure

Instructions for changing motor voltage using the voltage plug and terminal board.

Booster Systems

Booster System Plumbing Diagrams

Referencing diagrams for plumbing booster systems from city water or cisterns.

Seasonal Service

Technical Data

Motor Voltage Change and Terminal Board

Details on changing motor voltage via terminal board and voltage plug.

Deep Well Tailpipe Usage

Explanation on how tailpipes prevent loss of prime in deep well jet pumps.

Checking Shallow Well Suction Lift

Guide on using a vacuum gauge to measure suction lift and interpret readings.

Troubleshooting

Troubleshooting Symptoms and Causes

Lists common pump symptoms and their probable causes for diagnosis.

Limited Consumer Warranty