en – Original Instructions
ecocirc PRO – Installation, Operation and Maintenance Manual 7
2 Handling and Storage
2.1 Handling of the packed unit
WARNING:
Take appropriate measures during transport, installation and storage to prevent contamination
from external substances.
The Manufacturer delivers the unit and its components in a cardboard box.
2.2 Unit inspection upon delivery
2.2.1 Inspect the package
1. Check that quantity, descriptions and product codes match the order.
2. Check the packaging for any damage or missing components.
3. In case of immediately detectable damage or missing parts:
- accept the goods with reserve, indicating any findings on the transport document, or
- reject the goods, indicating the reason on the transport document.
In both cases, promptly contact Xylem or the Authorised Distributor from whom the product was
purchased.
2.2.2 Unpacking and inspection of the unit
CAUTION: Cut and abrasion hazard
Always wear personal protective equipment.
1. Remove packing materials from the product. Dispose of all packing materials in accordance
with local regulations.
2. Check the unit for integrity and to make sure that there are no missing components.
3. In case of damage or missing components, promptly contact Xylem or the Authorised
Distributor.
Content of the package
• Pump unit
• Thermal insulating shell
(for models 15-
_
/65B, 15-
_
/110MB and 15-
_
/110LB only)
• Check valve – G1/2
(for models 15-
_
/65B only)
• Sealing ring for foreign pump housings – Ø61/Ø54x3.55 mm
(for models 15-
_
/65B, 15-
_
/110MB and 15-
_
/110LB only)
• Sealing ring for foreign pump housings – Ø60.8/Ø54x5 mm
(for models 00-
_
/000 only)
• Spacer ring for foreign pump housings – Ø54/Ø52x2 mm
(for models 00-
_
/000 only)
• Safety Instructions and Quick Startup Guide