1
3
3
4
2
Step 1. Pull both cable assembly through the main body plate
Step 2.1. Place the spindle retaining ring to the hole as shown in the picture.
Step 2.2. Insert the spindle into the mortise through the spindle retaining ring
Step 3. Secure the main body plate with the pull screws
Step 4. Remove the spindle retaining ring and the spindle
Step 5. Cut the transmission plate to the required length according to Table 1.2.1 in section 1.2
Insert the spindle into the main body
and ensure the positioning pin is
aligned and inserted to the designated
hole as shown in the picture
Step 1. Insert the spindle into the main body. Make sure the positioning pin is aligned and
inserted to the designated hole to secure the spindle
Step 2. Connect the cable assemblies to the respective connectors on the main body.
Tuck the excess cables into the door panel
Step 3. Secure the main body with the round head screws (M4)
Step 4. Install the handle cover then the battery
2.3 Main body plate installation 2.4 Main body installation
InteriorExterior
5
2.1
2.2
Pull screw
Pull screw
Spindle
Retaining Ring
positioning plug
Spindle Retaining Ring
Main body plate
Spindle
Spindle
Pull screw
Cut the positioning plug and transmission
plate according to Table 1.2.1 in section 1.2
Lever
handle cover
Mortise connector (right)
Front body connector (left)
1
16
4
3
Spindle Retaining Ring
1
15
Mortise