TABLE OF CONTENTS
1.
INTRODUCTION 1
2.
PROGRAMMING 1
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2,8
Tape Format 1
Program Number and
Coordinate Words 7
Rapid Traverse Rate
sequence Number 6
10
spindle-Speed Function (S-Function) 13
TOO I Function (T-Function) 14
Miscellaneous Functions (M-Function) 19
Preparatory Functions (G-Function) 23
3.
NC TAPE PUNCHING 148
3.1 Tape code 148
3.2 Programming 148
3.3 NC Tape 150
3.4 NC Tape Handling 150
4. STANDARD NC OPERATOR’S STATION WITH
CRT CHARACTER DISPLAY
151
4.1
4.2
u. 3
4.4
4.5
4.6
4.7
4.8
Pushbuttons,
Key S, and Lamps 151
Power ON/OFF Operation 155
Display and Writing Operation 156
Loading Part Programs and NC Data into
Memory (in) 174
Tape Verifying 178
Edit 180
Part Program and NC Data Output
Operations 183
Summary of Storing and Editing
Operations 186
5. MACHINE CONTROL
5.1 Switching Units on
STATION 187
the Control Station
5,2 Operation procedure 198
6.
OPERATION PROCEDURE 213
187
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
Inspection before Turning on Power 213
Turning on Power 213
Manual Operation 213
Preparation for Stored Lead Screw Error
Compensation and Stored Stroke Limit 214
Preparations for Automatic Operation 214
Operation in Tape and Memory Mode 215
Manual Operation Interrupting Automatic
Operation 216
Automatic Operation in MD I Mode 216
MD I Operation Interrupting Automatic
.
Operation 216
6.10 Preparation for Turning off Power 217
6.11 Turning off Power 217
APPENDIX 1
APPENDIX 2
APPENDIX 3
APPENDIX 4
APPENDIX 5
APPENDIX 6
LIST OF SETTING NUMBERS A–1
LIST OF PARAMETER NUMBERS A–?
STORED LEADSCREW ERROR COM-
PENSATION A–25
LIST OF STANDARD lNPUT/OUT-
PUT SIGNALS A–26
LIST OF ALARM CODES A–35
LIST OF DATA A–54