EasyManua.ls Logo

YOKOGAWA WT332E - Page 71

YOKOGAWA WT332E
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-37
IM WT310E-02EN
Making Preparations for Measurements
1
2
3
4
5
6
7
App
Index
You can also connect to the circuit under measurement by placing a terminal block near the
WT332E/WT333E and connecting the power cables and voltage measurement cables to the
terminal block.
TSR
Terminal block
T
S
R
RST
Wiring Procedure with the Three-Voltage, Three-Current Method
(3V3A)
You can configure the wiring for the three-voltage, three-current method (3V3A) by adding the following
wiring to the wiring for a three-phase, three-wire system.
Wiring to the Current Input Terminals
In the aforementioned steps 1 and 2, connect the current input terminals of element 2 to the
S-phase power cable.
Wiring to the Voltage Input Terminals
In the aforementioned steps 3 to 5, connect the voltage input terminals of element 2 so as to
measure the line voltage between phase R and phase T.
The result of wiring the three-phase, three-wire system shown in the figure above is for the three-
voltage, three-current method (3V3A) is shown below.
TSR
Terminal block
T
S
R
RST
±
V
±
V
±
V
R
S
R
T
T
S
SOURCE
LOAD
I1
±C
±
I3
±
C
U1
±
V
U3
V
R
N
ST
U2
±
V
I2
±C
2.9 Wiring the Circuit under Measurement for Direct Input

Table of Contents

Related product manuals