SLRS SEISMIC ISOLATOR INSTALLATION AND ADJUSTMENT
To Install and Adjust Mounts:
1. Supports for mountings must be leveled to installa-
tion's acceptable tolerances.
2. Mountings not subjected to seismic or wind forces
do not require bolting to supports.
3. Mountings subjected to seismic or wind forces must
be bolted or welded in position.
4. If mountings are welded in position, remove lower
friction pad before welding.
5. Set mountings with top channels held in place by
the lower restraining nuts and limit stops.
6. Place equipment on mountings and secure by bolting
or welding.
7. Hold lower restraining nut in place and turn verti-
cal limit stop bolt counter-clockwise until there is
a 1/8 in. gap between the bolt head and the steel
washer.
"D" Tap - 4 Holes unless
otherwise requested
Adjustment
Bolt
Vertical Limit
Stops-Out of
contact during
normal operation
Non-Skid Neoprene Pad-
Pad can be removed if
mounts are welded
into position.
Enclosed
Steel
Housing
Internal
Neoprene
Acoustical
Pad
Lower
Restraining
Nut
Rubber
Snubbing
Collar
MBD -Max
Bolt
Diameter
SHIPPED & INSTALLED
AFTER ADJUSTMENT
1/4"
1/8"
LIMIT STOP
BOLT
LOWER
RESTRAINING
BOLTS
LD10568
8. Turn adjustment bolt 8 turns on each mount.
9. Take one additional complete turn on each adjust-
ment bolt in sequence until the top plate lifts o of
the lower restraining nuts. Take no additional turns
on that mount. Continue with equal turns on the
other mounts until the top plates lift o of the lower
restraining nuts of all mounts.
10. Hold the limit stop bolt in place and turn the lower
restraining nut clockwise and tighten it against
the stanchion. Repeat the same procedure on all
mounts.
11. Top plate should remain at a xed elevation, plus
or minus 1/8 in.